beautypg.com

End cap installation – USG C2 Paired Compasso Channels User Manual

Page 10

background image

Step 1

At termination points, attach an end cap
on each C

2

channel. Note that there are

both right and left end caps.

Step 2

Hook the lower lip of the end cap over the
bottom flange of the C

2

channel, then bend

the top tab of the end cap over the top
flange of the channel.

Step 3

Install the end segments.

Tip: Depending on design, the channel
ends may be aligned or offset. Refer to the
shop drawing for details on your specific
installation.

Page 10 of 12

Installation
Instructions

End Cap
Installation