beautypg.com

Installation – Regency Energy E18 Small Gas Insert User Manual

Page 14

background image

14

Regency

®

E18 Gas Fireplace Insert

INSTALLATION

12. When framing is complete, ensure wiring is installed by an electrician

prior to installing ZC kit.

13. Install the base of the ZC kit fi rst. Knockout may need to be removed

to accommodate gas line - see below for example.

14. Install one side section of the ZC kit. Fasten side and back with

(904-576) screws provided. Fasten the header tab (folded in Step
11 to the 2"X4" with 1 screw.

NOTE: Side/back sections–fi t inside base section.

15. Install the back section of the ZC kit. Fasten bottom, back and side

sections with (904-576) screws provided.

16. Install the remaining side of the ZC kit. Bring the electrical box to the

inside of the ZC kit. Fasten side and back sections with (904-576)
screws provided.

17. Assemble ZC kit surround with 8 (904-897) screws provided in loca-

tions shown below.

18. Secure surround and outside fl ange of ZC sides to the stud on each side
with (904-897) screws provided.

Assemble the

ZC box surround
with 4 screws on

each side.

Use 4 screws on each side to secure surround

and ZC box to studs.

Fasten ZC box sections with provided screws.

Base install

Sides/Back install