beautypg.com

Installation, Zero clearance framing venting configurations – Regency Energy E18 Small Gas Insert User Manual

Page 12

background image

12

Regency

®

E18 Gas Fireplace Insert

INSTALLATION

ZERO CLEARANCE FRAMING

VENTING CONFIGURATIONS

The E18 is approved to be attached to any of the approved appliances listed
in the Installation Checklist. The existing unit must be connect to B-Vent Pipe
having at least 8 feet of vertical venting and can having a maximum of 6 feet
horizontal venting with two 90 degree elbows. The venting must terminate
vertically with an approved B-Vent Cap.

When Installing the E18 as a Zero Clearance Unit, the E18 will connect to
4" B-Vent only. You must use a minimum of 8 feet of vertical pipe and you
may use up to a maximum of 6 feet of horizontal pipe with two 9 degree
elbows. The venting must terminate vertically with an approved B-Vent Cap.

All horizontal runs must maintain a 1/4" of rise for every foot of horizontal run.

PP

0LQ

PP

0LQ

PP

PP

0LQ

PP

0LQ

PP

0LQ

&KDVH

'HSWK

+HDGHU+HLJKW

&HLOLQJ+HLJKW

(,QVHUW

=HUR&OHDUDQFH

.LW6XUURXQG

)UDPLQJ

7\SLFDO

)UDPLQJ

1. When installing the E18 as a

zero clearance, you will use
the framing clearances in the
following diagrams. Mantel
and inside corner clearances
can be found in Minimum
Clearances to Combustibles.

2. Attach the E18 to the Zero

Clearance Kit.

3. Attach the Zero Clearance Kit

to the Framing.

4. Install the Surround as per

manual.

Diagram 4.1

Diagram 4.2