Contents english – Sulky XEOS TF User Manual
Page 12

10
Read the manual carefully before use. Better understanding
means better and safer sowing. For English follow the symbol.
GB
• E
Using the front packer
• F
Green drilling kit
CONTENTS
English
Pages
START-UP
Pages
SETTINGS
46-51
52-53
54-55
56-57
• A
Setting the flow
• B
Markers
• C
Folding bar depth setting
• D
Rigid bar depth setting
Pages
MAINTENANCE
66-67
66-67
68-69
68-69
70-71
Pages
SETTING CHARTS
88-89
• A
Seeding charts
58-59
60-63
64-65
• E
Adjusting the harrow
• F
Tramlining
• G
Using the front hopper with
fertilizer
Pages
ACCESSORIES
76-77
78-79
80-81
82-83
• A
Depth limiter
• B
Areameter
• C
Packer wheels
• D
Using the hydraulic selector
84-85
86-87
15
14-15
14-15
14-15
16-17
16-17
18-21
• A
Preparing the machine
• B
Handling the seed box
• C
Handling the rigid coulter bar
• D
Handling the folding coulter bar
• E
Alignment of the XEOS TF
pipes
• F
Side pipe
• G
Hitching and unhitching the
coulter bar and Cultiline
power harrow
22-25
26-27
28-29
32-33
36-39
40-41
40-41
42-43
44-45
• H
Hydraulic connection
• I
Electrical connection
• J
Fan
• K
Tractor control
• L
Road travel
• M
Cultivating without drilling
• N
End-of-field manoeuvres
• O
Loading platform
• P
Filling the hopper
• A
Cleaning
• B
Greasing
• C
Check
• D
Metering device
• E
Technical specifications
Pages
BEFORE START-UP
13
• A Recommendations for use
REQUIRED
REQUIRED
READING
READING
72-73
72-73
74-75
• F
Sticker positions
• G
Storage
• H
Emptying the hopper