Commissioning and operation
Important notes
8
EN
37
Lenze ¯ BA 33.0006 ¯ 3.0
8
Commissioning and operation
8.1
Important notes
For trial run without output elements, lock the featherkey. Do not deactivate the
protective devices, not even in a trial run.
Check the correct operation of the brake before commissioning motors with brakes.
8.2
Before switching on
)
Note!
Before switch−on, you must ensure that the motor starts with the
intended direction of rotation.
Lenze motors rotate CW (looking at the driven shaft) if a clockwise
three−phase field L1
W U1, L2 WV1, L3 W W1 is applied.
Before initial commissioning, before commissioning after an extended standstill
period, or before commissioning after an overhaul of the motor, the following must be
checked:
¯
Measure the insulation resistance, in case of values
£1 kWper volt of rated
voltage, dry the winding.
¯
Have all screwed connections of the mechanical and electrical parts been firmly
tightened?
¯
Is the unrestricted supply and removal of cooling air ensured?
¯
Has the PE conductor been connected correctly?
¯
Have the protective devices against overheating (temperature sensor evaluation)
been activated?
¯
Is the controller correctly parameterised for the motor?
(
, Controller operating instructions)
¯
Are the electrical connections o.k.?
¯
Does the motor connection have the correct phase sequence?
¯
Are rotating parts and surfaces which can become very hot protected against
accidental contact?
¯
Is the contact of good electrical conductivity if a PE connection on the motor
housing is used?