Environmental Express SPE-Express with Cover User Manual
Page 34
SPE-‐Express Operation and Instruction Manual
www.envexp.com
33
o Raise sliding glass chamber into upper position.
o Ensure that the sliding glass chamber is properly sealed.
o Install spring clamp after seal is made.
o Ensure doors are closed.
•
Press “Ready” to continue the second test.
•
Press the “Abort Test Station” button to stop all procedures within the station and to remove power
from all station components.
•
Press the “Abort All”
three station components.
3.4 Operating Multiple Stations
All three stations may be run simultaneously by toggling between the designated station tabs in the left hand
corner of the Operator Test Screen.
The software requires that the user acknowledge any prompt appearing while running station procedures prior to
returning to the Operator Test screen.
3.5 Operating Two Units
All six stations may be run simultaneously by toggling between the designated station tabs in the left hand corner of
the Operator Test Screen. Unit 1 will always be the unit on the left and unit 2 will be the unit on the right. The
stations in unit 1 will retain the identification numbers 1-3 while the stations in unit 2 will be reassigned as stations
4-6.