Revision B (6-01): Various corrections
Revision C (11-01): Corrections, addition of schematic drawings
Revision D (1-02): Corrections, update of schematic drawings
Revision E (4-02): Update of schematic drawings, modified per Rev C Protocol Plus
software
Revision F (7-02): Corrections to Protocol Plus software description
Revision G (9-02): Miscellaneous corrections
Revision H (11-02): Modify operating procedure, update schematic drawings
Revision I (1-03):
Update Despatch warranty pages
Revision J (5-03): Update of schematic drawings
Revision K (8-03): Update of schematic drawings
Revision L (11-03): Update to Protocol Plus Version 4.0.
Revision M (12-03): Add door lock manual override and Nitrogen needle valve
information
Revision N (2-04): Update of schematic drawings
Revision P (9-04): Update of schematic drawings
Revision Q (11-04): Update of schematic drawings
Revision R (3-05): Update of schematic drawings
Revision S (6-05): Update Declaration of Conformity
Revision T (12-05): Update Declaration of Conformity, add LLC notes
Revision U (8-06): Revised Protocol Plus numbers. Updated Despatch address.
Updated CE documents.
Revision V (11-07): Updated warranty
Revision W (12-07): Corrected Nitrogen Inlet connection from 3/8” to 1/4”.