Roll band application – BAND-IT A94079 Ultra-Lok User Manual
Page 4

A94051.doc Rev “G“
Operating Instructions
A94079 Ultra-Lok Tool
Roll Band Application
A. Turn adjustment knob until tension indicator is set to –0-.
B. While holding handle all the way out from tool body, insert desired length of roll band into rear of tool head.
C. Pull handle towards tool body until band is cut. Hold handle away from tool body. Pull band out from front
of tool head.
D. If making more than one clamp, repeat the above steps.
E. Remove band from rear of tool head.
F. Slide buckle onto band until it is up against the buckle stop formed by the tool. “BAND-IT” logo should be
opposite the protrusion on the buckle stop.
G. Slide other end of band through buckle to form a clamp.
H. Repeat steps 1 through 7 on the previous pages of this instruction sheet.
I. To make another clamp after already clamping an object, do not force handle open, instead, position roll
band behind the tool head and slowly move handle away from tool body until band passes through to
desired length. Pull handle towards tool body until band is cut. Repeat E, F, G, H.
Note: if handle “snaps” out during step I, you must start over with step A.
.015 x .250 wide
roll band
A201 buckle
Page 4 of 4