JB Conversions 2800 LoMax 205 User Manual
Page 16

LoMax™ 205 – Case and 3:1 Gear Set
JB Conversions, Inc.
Page 15
337-625-2379
337-626-8365 fax
www.jbconversions.com
27. Remove the front retainer temporarily installed previously, apply RTV, and reinstall. Torque bolts
to 20-40 ft-lb.. Next install the rubber star washer over the threaded end of the shaft followed by
the end yoke or flange. The flange/yoke nut should be torqued to 190 ft-lbs..
28. Remove the output shaft snap ring and slide the steel bearing housing up and off of the shaft.
29. When you lift up the housing, the needle bearings will fall out.
30. Remove the ball bearing from the top of the bearing housing.
31. Trim the oil vane with a grinder or saw. Remove 1/4” of material.