3 notes on installing the pneumatic components – Festo Контроллер крайних положений SPC11 User Manual
Page 19
1. Installation instructions for the DNCI or DDPC
1-5
Festo P.BE-SPC11-DNCI-EN en 1208a English
1.3
Notes on installing the pneumatic components
Caution
If the operating voltage is switched off while the com-
pressed air supply is still switched on, the actuators may
be triggered, resulting in unexpected movements which
may cause damage. Switch off the operating voltage and
the compressed air supply at the same time or in the fol-
lowing sequence:
1. compressed air supply
2. operating voltage
Please note
Make sure that the compressed air supply and the operat-
ing voltage are switched off before starting installation and
maintenance work.
General rules for building up the system can be found in the
system manual type P.BE-SPC11-SYS... . Special instructions
on operation with standard cylinder type DNCI-... can be
found in the following sections.
Please note
Observe the following instructions on installing the pneu-
matic components. Only then can you guarantee faultless
operation.