beautypg.com

Walk-in, Utdoor, Ystems – Nor-Lake Capsule Pak Refrigeration Systems User Manual

Page 15

background image

07/14 Rev. H 040086

15

outdooR SyStemS utilizing a membRane Roofing mateRial

1. After the walk-in is completely assembled,

place the curb face down on top of

the ceiling sections (curb is fastened

to crate base during shipping and

must be removed and installed prior to

membrance roof installation). To ensure

proper opening alignment, mark the

outside portion of the curb on the ceiling

sections with a marking pencil.

2. Remove the paper from the gasket and

position the curb, gasket side down, on

the pencil line. Press down firmly. Note:

Movement of the curb is very difficult

after the gasket adheres to the ceiling

section. Refer to Figure 1.

3. Lay the membrane roofing material

over the walk-in ceiling sections and

curb leaving a six inch overhang

on all four sides of the walk-in.

Using an utility knife, cut a hole in

the membrane roof approximately

1-1/2” in from the edge of the

opening. (The resulting hole in the

membrane will be smaller than the

ceiling opening). Fold the 1-1/2”

membrane flaps into the opening,

notching the membrane around

the locators and divider. Use either

sheet metal screws, caulk, glue,

etc. to fasten the membrane roofing

material to the inside edge of the

curb frame. Refer to Figure 2.

Curb

Alignment Marks

Ceiling Sections

Walk-In

Figure 1

o

utdooR

S

yStemS

Membrane

Roofing

Opening

Fasten to Edge

of Curb Frame

Cutout Line

Walk-In

Figure 2