Nor-Lake Capsule Pak Refrigeration Systems User Manual
Page 13
07/14 Rev. H 040086
13
8. Once the suction line is connected, the sponge insulation must be
pulled up to cover the quick connects. Tie or tape off the insulation to
prevent air infiltration and reduce water/ice formation on the suction
line.
All valves are open and the system is ready for operation. Remember,
the refrigeration couplings on this system are self sealing and, if the
need ever arises, the couplings may be disconnected without any loss
of refrigerant.
IMPORTANT: Since this system is equipped with pre-charged
refrigerant lines, it is the installing contractor’s responsibility to ensure
that the quick connect refrigerant couplings are properly mated and
are leak free. It is also their responsibility upon start-up to check the
system for proper operation and make any necessary temperature
control or thermal expansion valve adjustments.
Note: A drain line is required to be run by the contractor for this type
of installation.
CAUTION: Line set must not exceed 3 feet longer than required length
to complete connection or improper oil return may result in compressor
failure. Contact the Service Department with model and serial number
for further assistance.This information is also included on a tag
attached to the line set.
Some systems require a permanent connection to an electrical
service and a connection at the junction box located within the
condensing unit housing. Refer to the serial tag for all pertinent
electrical data. These systems must be connected to a power
supply disconnect switch and wired according to local and
national electric codes.
Connecting to the Evaporator Section Side
R
emote
R
efRigeRation
S
yStemS