Nor-Lake General Purpose Lab Ref-Fzr User Manual
Nor-Lake Refrigerators
LABORATORY REFRIGERATOR-
FREEZER
Installation, Operation and
Maintenance Instructions
INSPECTION
When the equipment is received, all items should be carefully checked against the bill of lading to
insure all crates and cartons have been received. All units should be inspected for concealed
damage by uncrating the units immediately. If any damage is found, it should be reported to the
carrier at once, and a claim should be filed with the carrier. This equipment has been inspected and
tested at the manufacturing facility and has been crated in accordance with transportation rules and
guidelines. Manufacturer is not responsible for freight loss or damage.
Before connecting the refrigerator to the power supply, let it stand for approximately two hours to
reduce the possibility of malfunctions in the cooling system due to transport handling
INSTALLATION
GENERAL
After the unit crate and crate base have been removed, ensure that the cabinet is level. All four
corners of the unit must rest firmly on a solid floor. The cabinet is equipped with adjustable front
rollers to level the unit. Remove the toe grill as shown below and use a flat bladed screwdriver or
3/8” socket wrench to adjust the front rollers (see the illustration below). Raise the front of the
cabinet enough so that the doors will close freely when opened halfway. The cabinet should slope
¼” to ½” from front to back. Then level the cabinet from side to side.
Note:
It is extremely important that the refrigerator be level in order to function properly. If the
refrigerator is not properly leveled during installation, the door may be misaligned and not close or
seal properly causing cooling, frost or moisture problems.
1
05/07 138708