Nor-Lake Plasma Freezers & Blood Bank Refrigerators User Manual
Nor-Lake Refrigerators
PLASMA FREEZERS and
BLOOD BANK REFRIGERATORS
Installation, Operation and
Maintenance Instructions
INSPECTION
When the equipment is received, all items should be carefully checked against the bill of lading to
insure all crates and cartons have been received. All units should be inspected for concealed
damage by uncrating the units immediately. If any damage is found, it should be reported to the
carrier at once, and a claim should be filed with the carrier. This equipment has been inspected and
tested in the manufacturing facility and has been crated in accordance with transportation rules and
guidelines. Manufacturer is not responsible for freight loss or damage.
INSTALLATION
GENERAL
Insure that the cabinet crate is on a smooth level surface. While supporting the cabinet cut the
banding straps that secure the cabinet to the crate base. Check and confirm that the casters/legs
are screwed completely and tightly into the cabinet base. Be aware that the cabinet is top heavy
and carefully remove the cabinet from the crate base.
If the condensing unit compressor is semi-hermetic, it is secured for shipping on the 1 door and 2
door models. Remove the spring clips and loosen the mounting bolts prior to operation. See
the label attached to the condensing unit. If the condensing unit compressor is hermetically sealed,
no spring clips or mounting bolts are present.
If for some reason the doors are not squared up on the cabinet, the doors can be adjusted. Opening
the door(s) and loosening the screws that hold both the top and bottom hinges to the cabinet can
accomplish this. After adjusting the door so that it is aligned correctly, tighten the screws to securely
hold the hinges in place.
1 7/09 124064