beautypg.com

Initial start-up – Blodgett DS-SC Series User Manual

Page 8

background image

8

OM-DS-SC

Once the unit has been installed, test it to be sure that the unit is working correctly.

1. Remove any literature and packing material from both the interior and the

exterior of the unit.

2. Make certain that the water supply is open.

3. Turn on the electrical power to the unit.

4. When steam is available for the cavity, choose one of the following:

A. Set the timer to the desired time for timed steaming.

B. Turn the timer to the manual ON position for continuous steam.

NOTE: The door must be shut before steam will enter the cavity. If the door is

opened when the timer is on, the flow of steam will stop.

C. Let the steamer sit idle until needed.

5. If the unit will not be used for an extended period, turn off power to the individual

steamer compartments. Turn off power to the gas or electric pressure boiler.

Refer to the steam boiler operator manual, if necessary.

If the unit functions as described above, it is ready for use. If it does not, contact your

Authorized Service Agent.

WARNING

STAY AWAY FROM STEAM COMING OUT

FROM THE UNIT. STEAM CAN CAUSE

SEVERE BURNS.

Initial Start-Up