Preparing the Site

Make sure that you follow common sense installation site
requirements and observe the following:

" Make sure that the switch’s power is accessible and cables can

be connected easily.

" Cabling must be away from sources of electrical noise such as

radios, transmitters, broadband amplifiers, power lines, and
fluorescent fixtures.

" Air flow around the switch and through its vents on the side

and rear cannot be restricted.

" If you are desk mounting the switch, make sure it is placed on

a level, secure desktop.

" Do not place objects on top of the switch.

" Do not expose the switch to moisture or water.

" Make sure it is in a dust-free environment.

" Use dedicated power circuits or power conditioners to supply

reliable electrical power to the network devices.