beautypg.com

Install the brackets as indicated in the follow, Figure16: installing stacking brackets, Attach the power cords of all units – Allied Telesis AT-MR912TX User Manual

Page 43: Use the scsi type ii cable to connect the out p, Do not match out to out or in to in when connec, Repeat the preceding steps until you have conne, Check the front of each hub in the stack to mak, Plug all category 5 stp/utp cables in the 100ba

Install the brackets as indicated in the follow, Figure16: installing stacking brackets, Attach the power cords of all units | Use the scsi type ii cable to connect the out p, Do not match out to out or in to in when connec, Repeat the preceding steps until you have conne, Check the front of each hub in the stack to mak, Plug all category 5 stp/utp cables in the 100ba | Allied Telesis AT-MR912TX User Manual | Page 43 / 68 Install the brackets as indicated in the follow, Figure16: installing stacking brackets, Attach the power cords of all units | Use the scsi type ii cable to connect the out p, Do not match out to out or in to in when connec, Repeat the preceding steps until you have conne, Check the front of each hub in the stack to mak, Plug all category 5 stp/utp cables in the 100ba | Allied Telesis AT-MR912TX User Manual | Page 43 / 68