beautypg.com

Sfp handle – Allied Telesis AT-GS950/8POE User Manual

Page 51

background image

AT-GS950/8POE Gigabit Ethernet WebSmart Switch Installation Guide

51

2. Remove the transceiver from its shipping container and store the

packaging material in a safe location.

3. Position the transceiver with the label facing up.

4. Slide the transceiver into the slot until it clicks into place. See

Figure 15.

Figure 15. Installing an SFP Transceiver

5. Verify that the handle on the SFP transceiver is in the upright position,

as shown in Figure 16, to prevent inadvertently removing the
transceiver.

6. Remove the SFP cover as shown in Figure 16.

Figure 16. Removing the SFP Cover

1344

SFP

SFP

CLASS

1

LASER

PRODUCT

8R

7

8

100/1000B

ase-X

SFP Handle

1345

SFP

SFP

CLASS

1

LASER

PRODUCT

8R

7

8

100/1000B

ase-X

SFP Handle