beautypg.com

Figure 11: attaching the switch to the wall, Chapter 2: installing the hardware 42, Cla ss 1 las er p rod uct – Allied Telesis AT-GS950/8POE User Manual

Page 42

background image

Chapter 2: Installing the Hardware

42

5. Place the switch on the wall. Then mount the switch using the four

#10-32 Phillips screws which are shipped with the product as shown in
Figure 11.

Figure 11. Attaching the switch to the wall

Note

For cabling information, see Chapter 3, “Cabling the Network Ports”
on page 45.

1353

AT-GS950/8POE

8 Po

rt 10/100/

1000M

bps + 2

SFP

Com

bo W

ebSm

art Sw

itch

SFP

SFP

CLA

SS 1

LAS

ER P

ROD

UCT

1

2

3

4

5

6

7R

7

8

8R

POWER

RESET

1

2

3

4

5

6

7R

8R

7

8

POE

100

/1000Base-X

PO

RT AC

TIV

ITY

ACT

1000

LIN

K

100

LIN

K

ACT

ACT

SFP