beautypg.com

Chapter 2: installing the hardware 40, Class 1 laser p roduct – Allied Telesis AT-GS950/8POE User Manual

Page 40

background image

Chapter 2: Installing the Hardware

40

Figure 8. Attaching Rack-Mount Brackets

5. Install the second rack-mount bracket on the other side of the switch

with the four remaining screws.

6. Mount the switch in a 19-inch rack using standard screws (not

provided), as shown in Figure 9.

Figure 9. Mounting the Switch in a Rack

Note

For cabling information, see Chapter 3, “Cabling the Network Ports”
on page 45.

1348

AT-GS950/

8POE

8 Port 10/100/

1000Mbps

+ 2 SFP Comb

o WebSma

rt Switch

SFP

SFP

CLASS 1

LASER P

RODUCT

1

2

3

4

5

6

7R

7

8

8R

POWER

RESET

1

2

3

4

5

6

7R

8R

7

8

POE

100/1000Base-X

PORT

ACTIVIT

Y

ACT

1000 LIN

K

100 LIN

K

ACT

ACT

SFP

1349

SFP

SFP

CLASS 1

LASER PR

ODUCT

5

6

7R

8R

7

8

100/1000B

ase-X