DME Toggle-Lok (Positive early ejector return) User Manual
Page 3
Page 3 of 5
TL-9997 03/2010
ME-0508-PS-059(B)
11. Repeat steps 6, 7, 8, 9, 10 on opposite end of mold.
12. Place cover plates under Top Mounts and transfer clearance hole in cover plate for
dowel.
13. Rest Top Mount on top of ejector plate (or in machined pocket in top of ejector plate
depending on option decided on in step #5) with cover plate in place under Top Mount
and move until arm is against lever. Then, transfer from Top Mount location for two
(2) 1/4-20 UNC S.H.C.S.
14. Repeat at other three locations.
15. Then, drill and tap for 1/4-20 UNC S.H.C.S. and reassemble with cover plate in place
under Top Mount.
16. Ensuring the correct location as in step #13, tighten 1/4-20 UNC screws and transfer
location of 1/4 -inch diameter dowel from Top Mount.
17. Disassemble drill and ream for 1/4 -inch diameter dowel.
18. Assemble mold and engage linkage as in step #9.
19. Repeat steps 15 through 18 for all mounts.
20. Maintain 1/64 -inch clearance between mount and end of mold as specified in DME
Catalog.
21. Dry cycle mold on bench to check for proper operation of early return.
NOTE: For smoother operation, a thin coat of heavy grease should be applied to
leavers and arms.