beautypg.com

Completing the switch setup – HP ProLiant DL320e Gen8 v2-Server User Manual

Page 33

background image

Setup 33

o

Link/Act LED on the switch network port that is being used—Initially, solid green to indicate

successful connection, and then flashing green to indicate active communication with the network.

o

Fault LED—Remains off to indicate successful Self-Test completion.

For more information on the location of the switch LEDs and their behavior during the Self-Test process,

see the switch documentation.

Completing the switch setup

After the Ethernet cable connection is made, check the network LED status on both the server and the switch

to confirm successful connection:

In the server front panel, the NIC status LED

—Solid green

In the switch, the Link/Act LED on the network connector used—Initially, solid green to indicate
successful connection, and then flashing green to indicate active communication with the network.