beautypg.com

Remove the server from the rack – HP ProLiant DL320e Gen8 v2-Server User Manual

Page 16

background image

Operations 16

11.

Install the rack rail cable ties ("

Installing the rack rail cable ties

" on page

27

).

Remove the server from the rack

WARNING:

This server is very heavy. To reduce the risk of personal injury or damage to the

equipment:

Observe local occupational health and safety requirements and guidelines for manual

material handling.

Get help to lift and stabilize the product during installation or removal, especially when the

product is not fastened to the rails. HP recommends that a minimum of two people are required

for all rack server installations. A third person may be required to help align the server if the

server is installed higher than chest level.

Use caution when installing the server in or removing the server from the rack; it is unstable

when not fastened to the rails.

IMPORTANT:

The requirement of extending or removing the server from the rack when

performing installation and maintenance procedures depends on the rail system used:

If using a ball-bearing rail system, you can perform most installations and maintenance by
simply extending the server from the rack.

If using a friction rail system, to perform installations or maintenance that requires access panel

removal, remove the server from the rack.

1.

Power down the server (on page

14

).

2.

Extend the server from the rack (on page

14

).

3.

Remove the server from the rack. For detailed information, see the documentation that ships with the
rack mounting option.

4.

Place the server on a sturdy, level surface.