beautypg.com

Installing hardware options, Installing the server into the rack – HP ProLiant DL320e Gen8 v2-Server User Manual

Page 26

background image

Setup 26

WARNING:

When installing a server in a telco rack, be sure that the rack frame is adequately

secured at the top and bottom to the building structure.

Identifying the contents of the server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the

server. All the rack mounting hardware necessary for installing the server into the rack is included with the

rack or the server.
The contents of the server shipping carton include:

Server

Power cord

Printed setup documentation, Documentation CD, and software products

Rack mounting hardware kit and documentation (optional)

You need the following items for some procedures:

T-25 Torx screwdriver (only when the quick-release lever type rack ear option is installed)

T-10/T-15 Torx screwdriver

Hardware options

Operating system or application software

Installing hardware options

Install any hardware options before initializing the server. For options installation information, see the option

documentation. For server-specific information, see "Hardware options installation (on page

34

)."

Installing the server into the rack

To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship with

the rack hardware kit.
If you are installing the server into a telco rack, order the appropriate option kit at the RackSolutions website
(

http://www.racksolutions.com/hp

). Follow the server-specific instructions on the website to install the rack

brackets.
Use the following information when connecting peripheral cables and power cords to the server.

WARNING:

This server is very heavy. To reduce the risk of personal injury or damage to the

equipment:

Observe local occupational health and safety requirements and guidelines for manual

material handling.

Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. HP recommends that a minimum of two people are required

for all rack server installations. A third person may be required to help align the server if the

server is installed higher than chest level.

Use caution when installing the server in or removing the server from the rack; it is unstable

when not fastened to the rails.