beautypg.com

HP Modular Cooling System User Manual

Page 25

background image

Installation 25

1.

Route the water hoses from the HP Modular Cooling System Hook Up Kit through the floor cut-out, and
then use a hose wrench to install each main hose to the MCS-100 unit. For information on floor cut out

dimensions, see the HP Modular Cooling System 200/100 Site Preparation Guide.

2.

Route the drain hose to the drain collection system catch basin:

a.

Route the preinstalled clear drain hose into the gravity drain collection system catch basin.

b.

Position the gravity drain collection system below the water collection pan, enabling gravity to draw
the water out of the water collection pan and into the gravity drain collection system basin.

3.

Log in to the web interface:

a.

Enter the user name in the User Name field. The default user name is Admin.

b.

Enter the password in the Password field. The default password is Admin.