beautypg.com

Installing a non-hot-plug hard drive – HP ProLiant DL120 G6 Server User Manual

Page 29

background image

Hardware options installation 29

4.

Install the hard drive.

Installing a non-hot-plug hard drive

The server supports up to four SATA hard drives with the embedded controller.
The server supports up to four SAS hard drives with the following options:

Optional SAS controller

Optional SAS controller cable

Optional SAS hard drive LED cable ("

SAS hard drive LED cable option

" on page

37

) (for LED

functionality)

For optimal performance, do not mix SAS and SATA hard drives.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server unless

all bays are populated with either a component or a blank.

IMPORTANT:

If only one hard drive is installed, install it in the bay with the lowest device

number. For drive installation guidelines, refer to "SAS and SATA hard drive guidelines (on page

54

)."

To install the component:

1.

Power down the server (on page

15

).

2.

Remove the server from the rack (on page

15

).

3.

Remove the access panel (on page

16

).