beautypg.com

3 preparing hardware for migration, Verifying hardware and operating system support, Verifying application station system requirements – HP Virtual Connect Enterprise Manager Software User Manual

Page 16

background image

3 Preparing hardware for migration

Verifying hardware and operating system support

Before starting an X2P (P2P or V2P) migration, verify the following:

The source server operating system is supported on the destination server. To verify OS support
on ProLiant destination servers, see the following website:

http://www.hp.com/go/ossupport

For the supported hardware and software configurations of server migration, see HP Insight
Management Support Matrix
available at:

http://www.hp.com/go/insightmanagement/docs

Remove unsupported storage and NIC controllers from the destination server before performing a
migration. Unsupported storage and NIC controllers can be added back on the destination server,
with proper manual configuration, after performing a migration.

Verifying application station system requirements

The application station has the following prerequisites:

A supported Windows operating system running on physical hardware or as a Windows
guest on a supported hypervisor. For a list of supported operating systems, and CMS hardware
and software requirements and caveats see the HP Insight Management Support Matrix at
the following website:

http://www.hp.com/go/insightmanagement/docs

Microsoft iSCSI Initiator, which you can download and install from

http://www.microsoft.com

if not already available with the operating system on your application station.

Insight Control server migration installed on an NTFS partition

Availability of ports 51124 and 51125 (or ports specified during Insight Control installation
for agent communications and iLO booting)

Availability of port 51127

User account credentials with administrative rights

Free disk space of at least 300 MB per iLO Boot, while booting a destination server for P2P
and V2P

The initial installation of Insight Control server migration can take 1GB of storage space, and
each automatically booted destination server will need at least 300MB of storage space on
the application station for non-Gen8 servers.

16

Preparing hardware for migration

This manual is related to the following products: