beautypg.com

2 operating sequence, 3 series one plus controls and displays – Sterlco SSL and SSIL Series Hopper Loaders User Manual

Page 29

background image

29

5-2 Operating

Sequence

1. Blowback

sequence.

2. Motor

starts.

3. The flapper discharge valve seals under vacuum.

4. Material

conveys.

5. Hopper loader hopper fills.

6. Vacuum timer times out.

7. Motor

stops.

8. Blowback sequence begins, the flapper discharge valve opens

under the weight, and material dumps.

Steps 1 through 8 repeat automatically.

If the level switch remains open, the hopper loader remains idle until the material level in the
bin drops and frees the discharge valve. Steps 1 through 8 in the loading sequence listed here
resume automatically.


5-3 Series One Plus Controls and Displays

Series One Plus Controller Keys

UP Key

Press the

UP key to increment up parameter values.


DOWN Key

Press the

DOWN key to decrement down parameter values.


CLEAR

UP Key and DOWN Key—Press Together

Press the

CLEAR

UP key and DOWN key together simultaneously while turning on power to

reset to factory default values.