beautypg.com

Edwards Signaling 200 Series Testing & Wiring User Manual

Series 200 safety switches, Testing & wiring instructions

background image

S

AFE

T

Y

200 SERIES

42

1-800-336-4206

www.edwardssignalling.com

Testing
After mounting the switch and actuator, test the switch for proper

operation. Test with circuit disconnected from source and load. For

multiple switches in series, test one switch at a time with all other

guard doors closed. Then:
1. Hook the black and white leads of the switch to an Ohmmeter.

Move the gate or door open and closed several times slowly. At

all times the meter should read O.L. or “open.”
2. Hook the Ohmmeter to the black and red leads of the switch.

Move the door or gate open and closed. The meters should read

O.L. when the actuator is away and it should read less than 1

Ohm when the actuator is in range.
3. Hook the Ohmmeter to the white and red leads of the switch.

Move the door or gate open and closed. The meter should read

500-100 ohms when the actuator is away and it should read

O.L. when the actuator is in range.

Wiring
1. After the switch and actuator have been mounted and tested,

wire the FailSafe GuardSwitch

as shown in Figure 2.

2. For wiring 2 to 10 FailSafe GuardSwitches

in series, see Figure

3. (Do not exceed 10 switches in a series).
3. Failure to install in-line fuse voids warranty.

Troubleshooting
If the in-line fuse blows or the GuardSwitch

remains open:

1. Check the application for premature failure caused by

inrush-currents, tampering, excessive vibration and

misalignment.
2. Disconnect all three wires of GuardSwitch

and test according

to testing instructions, steps 1-3.
3. If the GuardSwitch

fails any of the three tests, it must be

replaced.
4. Replace the in-line fuse if blown.

Accessories

Part Number

Tamper proof screws & screwdriver

1953

#6 x 3/4"L Tampruf Roundhead Screw

1954

#8 x 1-1/2"L Tampruf Roundhead Screw

1955

Tampruf

®

Screwdriver

Wiring for two to ten FailSafe GuardSwitches

in series

Figure 3

Add a 1/2 amp fast-acting fuse in series to

protect the switch from premature failure caused

by inrush-currents, tampering, or excessive

vibration.

White

Black

Red

White

FailSafe

GuardSwitch

FailSafe

GuardSwitch

FailSafe

GuardSwitch

VAC/DC

Load

1/2A Fuse Required*

Black
Red

Red

Black

White

Wiring for one FailSafe GuardSwitch

Figure 2

Add a 1/2 amp fast-acting fuse

*

in series to

protect the switch from premature failure caused

by inrush-currents, tampering, or excessive

vibration.

*

Use fast-acting Littlefuse 216, fast-acting Microfuse or fast-acting

Pico II fuse up to 1/2 Amp.

Black

Red

1/2A Fuse Required*

FailSafe

GuardSwitch

Load

VAC/DC

White

Series 200 Safety Switches

Testing & Wiring Instructions

*

Use fast-acting Littlefuse 216, fast-acting Microfuse or fast-acting

Pico II fuse up to 1/2 Amp.

Accessories