beautypg.com

Before you start, Unpacking, Equipment supplied – Seca 685 User Manual

Page 27

background image

Model 685

27

GB

3. Before you start…

Unpacking

Remove the packing material and place the weighing platform onto a solid, flat

surface.

Equipment supplied

The equipment supplied includes:
• 1 weighing platform (A)
• 1 side element left (B)
• 1 side element right (C)
• 1 handrail (D)
• 1 cover left (E)
• 11 cover right (F)
• 1 bottom transverse bar (G)
• 2 covers (H)
• 1 foldable seat (I)
• Display head with support (J)
• 4 threaded anchor plates (K)
• 1 seca power supply unit (L)
• Operating instructions with a declara-

tion of conformity

A

B

C

D

E

F

G

H

I

J

K

L