beautypg.com

Mv1000 workflow – Yokogawa Button Operated MV2000 User Manual

Page 19

background image

MV1000 Workflow

To set up the MV for quick use in the field, follow these steps:

Install

Connect Cables

Turn ON

Set Measurement

Range

Insert CF card

Set Data Save

Options

Measure

Manage Data

Install the MV.

Installation: Page 20

Connect input/output wires and the power cord to the rear panel
terminals.

Connecting Input Cables: Page 22, Connecting a Power Cable:
Page 26

Turn the power ON.

Turning the Power ON/OFF: page 31

Select the measurement range, and configure the data save
options from the Quick settings menu.

Quick Settings: page 32

Press START/STOP to start measurement.

Measurement: Page 35

Check and manage the measured data.
Use the accompanying software program, DAQSTANDARD, to
display the measured data and convert the measured data to
Excel, Lotus, and ASCII formats.

DAQSTANDARD Viewer User’s Manual

(IM 04L41B01-63EN)

Insert the CF card that you will store data on.

Measurement: Page 34

19

IM MV1000-02E

This manual is related to the following products: