Mv1000 workflow – Yokogawa Button Operated MV2000 User Manual
Page 19
MV1000 Workflow
To set up the MV for quick use in the field, follow these steps:
Install
Connect Cables
Turn ON
Set Measurement
Range
Insert CF card
Set Data Save
Options
Measure
Manage Data
Install the MV.
Installation: Page 20
Connect input/output wires and the power cord to the rear panel
terminals.
Connecting Input Cables: Page 22, Connecting a Power Cable:
Page 26
Turn the power ON.
Turning the Power ON/OFF: page 31
Select the measurement range, and configure the data save
options from the Quick settings menu.
Quick Settings: page 32
Press START/STOP to start measurement.
Measurement: Page 35
Check and manage the measured data.
Use the accompanying software program, DAQSTANDARD, to
display the measured data and convert the measured data to
Excel, Lotus, and ASCII formats.
DAQSTANDARD Viewer User’s Manual
(IM 04L41B01-63EN)
Insert the CF card that you will store data on.
Measurement: Page 34
19
IM MV1000-02E