beautypg.com

Ndir gas analyzer installation 3, 6 electrical connections – Teledyne IR-7000 - Non-dispersive infrared series User Manual

Page 29

background image

NDIR Gas Analyzer

Installation 3


Teledyne Analytical Instruments., - Rev. 3

21

WARNING: If your application uses a toxic, flammable or explosive gas, use

additional leak checking methods such as a hand held gas sniffer.
Periodically, use a portable combustible gas analyzer or sniffer
around all joints and fittings.

When there are no leaks in the sample system, run span gas
through and then sample gas to check the flow rates. If you are
using a bypass loop, do not set the sample or calibration
regulators above 5 psig in an effort to increase the flow
.

3.6 Electrical

Connections

All electrical connections to the analyzer are made on the rear panel.

Figure 3-5 shows the rear panel for the IR7000 analyzer. Other models are
similar. Electrical connections to be made at the rear panel are:

Analog output

• O

2

channel output (optional)

2 solenoid valves (3 for explosion proof model)

4–20 mA current output (optional)

Figure 3-1: Suggested Sample System 1 (with Optional O

2

Cell )