1 unpacking and setting up your analyzer, Set up, Unpacking and setting up your analyzer – Nova-Tech PMB Moisture Analyzer User Manual
Page 7: 0 set

5
|
P a g e
© Adam Equipment Company 2009
3.0 SET
UP
3.1 UNPACKING
AND
SETTING
UP
YOUR
ANALYZER
Remove the analyzer from the packing by carefully lifting it out of the box.
Inside the box you will find everything needed to start using the analyzer-
9 AC power cable
9 Pan
Support
9 Stainless Steel Lower Chamber Insert
9 Sample Pan Lifter
9 Sample Pans (x10)
9 Spare Fuse, T5Amp
9 This User Manual
For PMB supplied from the USA only:
9 RS-232 Interface Cable for use with a PC
9 USB to PC cable
9 USB driver software on CD
IMPORTANT:
Before applying power the analyzer make sure the analyzer is configured for
the power in your area. The analyzer will have a label on the rear panel
showing the voltage required. 115VAC (±10%) or 230VAC (±10%). If the
label does not match your power do not attempt to use the analyzer, damage
to the analyzer could result.