Shutdown, Shutting down the analyzer, Chapter 4 shutdown – Luminex MAGPIX User Quick Guide User Manual
Page 20: Chapter 4: shutdown
Shutting Down the Analyzer
Run the daily shutdown routine to prevent clogs and crystallization of salt in the sample
probe. Clogs and crystallization of salt in the sample probe can cause problems with
calibration, verification, and data acquistion; they can also cause sample splashing. Shut
down the system properly to ensure system integrity.
1. On the Home page, click Shutdown. The Auto Maint tab opens, with System
Shutdown selected.
2. Click Eject.
3. Fill reservoir RA1 with 3/4 of DI water.
4. Fill reservoir RC1 with 3/4 of 10%-20% household bleach solution.
5. Verify that reservoir RD1 is empty.
6. Click Retract.
7. Click Run.
Chapter 4: Shutdown
15