beautypg.com

Machine operations, Fig 4.10, Fig 4.15 – Magnum Venus Plastech INNOVATOR II CONTROL UNIT User Manual

Page 15

background image


INSTALATION/OPERATIONS MANUAL

INNOVATOR II

MAGNUM VENUS PLASTECH

REV 1.40

MAY 2012

PAGE 15

FIG 4.10





FIG 4.15

Machine operations


Before the system can be used the air isolation sleeve-

valve must be moved to the “ON” position and the E-Stop must be

released. When air is initially supplied, all controls should automatically reset to their non-operational state.

NOTE: Residual pressures may remain in the system even though the E-Stop has been activated and the air
supply has been removed from the machine.

EMERGENCY STOP

BUTTON

PUMP PRESSURE

REGULATOR

PUMP PRESSURE GAUGE

STROKE

COUNTER

GEL ALARM

INDICATOR

CATAYLST O/P

INDICATOR

FLUSH BUTTON

MOLD PRESSURE

GUARD GAUGE

MOLD PRESSURE

GUARD REGULATOR

RESET BUTTON

CURRENT COUNT DISPLAY

PRESET COUNT DISPLAY

DIGIT LOCKOUT

DIGIT MODIFIERS

INJECTION BUTTON

STOP BUTTON

RECIRCULATION BUTTON