beautypg.com

Mounting the operator, Step 3 step 4 step 5 – Controlled Products Systems Group HCT5011O3-08 User Manual

Page 10

background image

C

L

C

L

Header Bracket

Gate Arm

C

L

C

L

C

L

Header Bracket

M O U N T I N G T H E O P E R A T O R

Lift the operator and align with center mark on ceiling. Have someone hold the
operator in place or use something as a support post, and bolt to ceiling. (A support
post is not part of the operator. Use only for installation.)

Bolt or weld arm to gate.

STEP 3

STEP 4

STEP 5

Concrete
Anchor
1/2" x 3 1/2"

Support
Post

Make sure the header bracket is in the center of the opening. Bolt or weld the end of the
track (header bracket) to wall.

8

This manual is related to the following products: