Mounting the operator, Step 3 step 4 step 5 – Controlled Products Systems Group HCT5011O3-08 User Manual
Page 10

C
L
C
L
Header Bracket
Gate Arm
C
L
C
L
C
L
Header Bracket
M O U N T I N G T H E O P E R A T O R
Lift the operator and align with center mark on ceiling. Have someone hold the
operator in place or use something as a support post, and bolt to ceiling. (A support
post is not part of the operator. Use only for installation.)
Bolt or weld arm to gate.
STEP 3
STEP 4
STEP 5
Concrete
Anchor
1/2" x 3 1/2"
Support
Post
Make sure the header bracket is in the center of the opening. Bolt or weld the end of the
track (header bracket) to wall.
8
This manual is related to the following products: