Installation of chain pinions – Controlled Products Systems Group 109837 User Manual
Page 11

11
FAAC MODEL 844 Slide Gate Operator
Notes on Rack Installation
Fig. 17
1 16
inch
• Make sure that, during gate travel, no rack elements derail
from the pinion.
• Do not, for any reason, weld the rack elements either to
the spacers or to each other.
• When the rack has been installed, to ensure that it
meshes correctly with the pinion, lower the gearmotor
The operators for chain and idle transmissions require the
installation of a Z16 or Z20 chain pinion.
4.5.1.
MODEL 844 ER CAT (Figs. 18 & 19)
1. Insert the pin on the shaft, using a hammer.
2. Fit the chain pinion on the shaft, making the channel
coincide with the pin. Tighten the screw and the appro-
priate washers.
Fig. 16
Fig. 19
Fig. 18
1. Insert the pin
g on the shaft, using a hammer.
2. Fit the idle transmissions bracket on the operator flange, using
the four screws
a (M5 x 12) and the appropriate washers b, in the
kit as shown in Fig. 20.
3. Fit the chain pinion on the shaft, making the channel coincide
with the pin and tighten the screw
d and the appropriate washers
e and f.
4. Pass the chain as shown in Fig. 21A and install the cover with
screw
a and washer c as in Fig. 20.
c
d
g
f
e
b
a
a
Fig. 20
Fig. 21A
Fig. 21B
position by about 1/16
inch (Fig. 17).
• Manually check that
the gate regularly
reaches the
mechanical stop limits
and make sure there
is no friction during
gate travel.
• Do not use grease or other lubricants between rack and
pinion.
4.5.
INSTALLATION OF CHAIN PINIONS
4.5.2.
MODEL 844 ER RF (Figs. 20 & 21)
0 to ⅜
⅛ to ½
- Measurements in Inches
In case of operators with magnetic limit switches, you have to
provide a bracket to mount them on the gate, following the proper
distances showed in Fig. 21B.
4.5.3.
LIMIT SWITCHES