FAAC MODEL 844 Slide Gate Operator

Notes on Rack Installation

Fig. 17

1 16

inch

• Make sure that, during gate travel, no rack elements derail

from the pinion.

• Do not, for any reason, weld the rack elements either to

the spacers or to each other.

• When the rack has been installed, to ensure that it

meshes correctly with the pinion, lower the gearmotor

The operators for chain and idle transmissions require the

installation of a Z16 or Z20 chain pinion.

4.5.1.

MODEL 844 ER CAT (Figs. 18 & 19)

1. Insert the pin on the shaft, using a hammer.
2. Fit the chain pinion on the shaft, making the channel

coincide with the pin. Tighten the screw and the appro-

priate washers.

Fig. 16

Fig. 19

Fig. 18

1. Insert the pin

g on the shaft, using a hammer.

2. Fit the idle transmissions bracket on the operator flange, using

the four screws

a (M5 x 12) and the appropriate washers b, in the

kit as shown in Fig. 20.

3. Fit the chain pinion on the shaft, making the channel coincide

with the pin and tighten the screw

d and the appropriate washers

e and f.

4. Pass the chain as shown in Fig. 21A and install the cover with

screw

a and washer c as in Fig. 20.

c

d

g

f

e

b

a

a

Fig. 20

Fig. 21A

Fig. 21B

position by about 1/16

inch (Fig. 17).

• Manually check that

the gate regularly

reaches the

mechanical stop limits

and make sure there

is no friction during

gate travel.

• Do not use grease or other lubricants between rack and

pinion.

4.5.

INSTALLATION OF CHAIN PINIONS

4.5.2.

MODEL 844 ER RF (Figs. 20 & 21)

0 to ⅜

⅛ to ½

- Measurements in Inches

In case of operators with magnetic limit switches, you have to

provide a bracket to mount them on the gate, following the proper

distances showed in Fig. 21B.

4.5.3.

LIMIT SWITCHES