beautypg.com

Npacking, Perator – Controlled Products Systems Group 1044182 User Manual

Page 5

background image

P age 5

M a y, 20 06

4 1 5 L LS Ope ra tor A nd
4 5 5 D C ontrol Pa ne l I nsta ll a ti on Ma nua l

U

NPACKING

THE

O

PERATOR

When you receive your 415 L LS Operator, complete the
following steps.

Inspect the shipping box for physical damage such as a
torn carton. Then inspect the operator after you remove
it from the box. Notify the carrier immediately if you
note any damage because the carrier must witness the
damage before you can file a claim.

As you unpack the box, insure that all the parts listed
below are included (See Figure 1).

(1) Control panel enclosure with control panel.

(1) 415 L LS Operator.

(1) 4 Conductor Electric Cable for Motor Connection
(1) 3 Conductor Electric Cable for Limit Switch

Figure 1. Parts of the 415 L LS Operator

Connection


(1) Package of mounting hardware:

(1) Rear mounting brackets
(1) Rear mounting plates that attach to the gate post

(or column)

(1) Front mounting brackets that attach the operators
to the gate leaves


(1) Parts package:

(2) Manual Release keys
(4) Snap rings
(1) Long pins for rear mounting (each requires 2 snap

ring)

(1) Short pins for front mounting (each requires 2

snap rings)

(1) Cable Cover
(2) Cable Strain Reliefs

9

Number Description

1 415

Operator

2

Manual Release Location

3 Piston

Rod

4

Front Mounting Bracket

5

Rear Mounting Bracket

6 Rear

Fork

7 Long

Rear

Pin

8 Cable

Cover

9 Short

Rear

Pin