beautypg.com

45 5 d c, Ont r ol, Ane l – Controlled Products Systems Group 1044182 User Manual

Page 23: Ns ta ll a t io n, Nstructions

background image

Page 23

M a y, 20 06

4 1 5 L LS Ope ra tor A nd
4 5 5 D C ontrol Pa ne l I nsta ll a ti on Ma nua l

T

HE

45
5 D C

ONT

R

OL

P

ANE

L

I

NS
TA
LL

A

T

IO

N

I

NSTRUCTIONS

When gate operator (2) reaches the positive stop
and the desired motor run time has been

reached, an open command must be given to

shut the motor off. At this point gate operator

(2) will automatically start to close.

When gate operator (2) reaches the position that
you want it to slow down, an open command

must be given to start the slow down phase.

When gate operator (2) reaches the positive stop
and the desired motor run time has been

reached, an open command must be given to

shut the motor off. At this point gate operator

(1) will automatically start to close.

When gate operator (1) reaches the position that
you want it to slow down, an open command

must be given to start the slow down phase.

When gate operator (1) reaches the positive stop
and the desired motor run time has been

reached, an open command must be given to

shut the motor off.

The display stops flashing and the gate is ready for

normal operation.

L

EARNING

T

IMES

WITH

L

IMIT

-S

WITCHES

Learning with the Limit-Switches can be done in two
different ways: One way (simple learning) does not
require positive stops or (complete learning) which does

require positive stops.

S

IMPLE

L

EARNING

(N

O

P

OSITIVE

S

TOPS

N

EEDED

)

Close the gates, enter “Basic Programming”, select the

TIME LEARNING function and press the + push-button for

1 second: the display begins flashing and the leaves

begin the opening movement.

The movement stops automatically when the opening

limit-switch(es) is reached and an activation is required to

get the display stops flashing. Press the “F” button once

more to exit programming, give the panel another “open”

signal.

When the gate operator(s) reaches its limit-switch(es)

time learning is complete.

C

OMPLETE

L

EARNING

(P

OSITIVE

S

TOPS

N

EEDED

)

N

OTES

:

If only one gate operator (1) is used, you must
go through the entire programming procedure,

as if you were programming a dual gate

operating system is being installed (2). When

the gate operator (1) has finished opening,

supply 5 open commands until the gate

operator (1) begins to close, and then

resume normal programming procedures.

Close the gates, enter “B

ASIC

P

ROGRAMMING

, select the

TIME LEARNING function and press the + push-

button for more than 3 seconds: the display begins

flashing and leaf 1 begins opening movement. The

following functions can be commanded by the OPEN

A command (by radio control or key push-button):

When gate operator (1) reaches the open
limit-switch, it starts to slow down. When

operator (1) reaches its positive stop an

open command must be given to shut the

motor off.

When gate operator (1) reaches its positive
stop and has shut off, gate operator (2) will

automatically start to open

When gate operator (2) reaches the open
limit-switch, it starts to slow down. When

operator (2) reaches its positive stop an

open command must be give to shut the

motor off.

When operator’s (2) motor shuts off it will
automatically start to close.

When gate operator (2) reaches the closed
limit-switch, it starts to slow down. When

operator (2) reaches its positive stop an

open command must be given to shut the

motor off.

When operator (2) reaches its positive stops
and the motor shuts off, gate operator (1)

will start to close automatically.

When gate operator (1) reaches the closed
limit-switch, It starts to slow down. When

operator (1) reaches its positive stop an

open command must be give to shut the

motor off.

The display will stops flashing. Press the “F” button

one last time to return to the status display and the

gate is ready for normal operation.

.

A

UTOMATED

S

YSTEM

T

EST

When you have finished programming, check if the

system is operating correctly.

Most important of all, check that the force is

adequately adjusted and that the safety devices are

operating correctly.

If pressure adjustments on hydraulic operators are

not set before programming. It may need to be

reprogrammed for desired results.