beautypg.com

Archived, Specification, Assembly instruction – FlexLink AGS Монтаж User Manual

Page 2: Ags-system layout

background image

Specification

Unit/Dept. Document

type Date

APD/Research & Development

Assembly Instruction

2006-05-19

Issued by

Document number Page

Approved

by

Fredrik Johansson

3928587-03

2/12

FJn


3928587_03.DOC

Archived

1. AGS-system layout


The AGS-system contains the following parts:

1. Control

box;

2. Guide

units;

3. Guide unit cables;
4. Junction

box;

5. Zone supply cables.


The points 4 and 5 are used when the number of Guide units are higher than the Control
box itself can control.

The default distance between Guide units is 1 meter. This may be changed depending on
application.

See picture next page.

For more information see document "Controls overview".

1.1 Integrator responsibility


Some parts of installation is application depending and part of the integrator’s
responsibility:

1. Box mounting frames;
2. Wire

ways;

3. Zone supply conductors (see chapter “4. Zone supply”)