ClimaCool SHC onDEMAND 30, 50, 70, 85 Manual User Manual
Page 42

www.climacoolcorp.com
40
Strainer Operation
ǡ
ƪ
collected and settles to the bottom of the strainer reservoir.
CS-3 strainers must have a valve installed on the drainage
port. The larger CS strainers (4CS, 6CS, 8CS and 10CS) are
ƪȋȌ
the strainer. When it becomes time to clean the strainer,
ƪ
ȋƪȌǤ
ƪ
ƪǤƪ
time will typically range from 15 to 60 seconds depending
ƪǡ
collected by the strainer. As a general rule, the larger strainers
will require higher inlet water pressures in order to achieve
ƪǤ ǡ͘
ƪ͕͙Ǧ͖͔ǡ
͚
ƪ͔͗Ǧ͙͗Ǥ͕͔͜
ƪ
than 40 psi. Note: When shutting down the chiller for
ǡ
Ǥ
If your strainer assembly is equipped with optional pressure
ǡơ
between the inlet and outlet sides of the strainer. When this
ơ
͙Ǧ͕͔
may require cleaning.
ǣ
ǦǤ
Follow the following steps when cleaning the
CS strainer element:
Step 1.
ȋȌǣ Remove the top of the
strainer by removing the Grade 5 Zinc plated
bolts from the lid.
Step 1.
ȋȌǣRemove the top of the
ơǦ
Ǥȗ
Step 2.
Lift the strainer element (conical screen) out of
the strainer body.
Step 3.
Carefully scrub down the strainer element with
a rigid nylon brush until all matter is loosened.
Do not use a steel brush.
͘Ǥ
ơ
Ǥ
Ƥ
amount of water pressure. Do not use a pressure
washer.
Step 5.
Wash all matter from the strainer gaskets and
clean the inner-ring where the bottom of the
strainer element rests.
͚Ǥ
ǦƤ
to the bottom of the strainer element. Reposition
the strainer element into the body of the strainer.
Step 7.
Make sure the strainer head gasket is secure on
the top of the strainer body. On V-band models,
O-rings should be seated completely in the body
ƪǤ
strainer body. Tighten the lid securely either
Ǧ
Ǥ
* For clamped models, opening and closing is achieved
without adjusting the lock nut. It is tightened at the
factory to the correct compression. (Minor tightening
may be necessary if the gasket loses memory over time.)
To open the clamp, depress the safety latch and pull
the over-center lever outward. To close the clamp,
make sure the T-bolt is seated in its receiver and push
the over-center lever back toward the strainer housing.
Be sure that the safety latch is engaged before putting
the unit to use.
͕͚Ǧ
Sequence
Table 2
Strainer Bolt
Size
(inches)
Recommended
Torque
;Ō͘ůďƐͿ
3CS
5/16 - 18
60 - 80
4CS
3/8 - 16
15 - 25
6CS
1/2 - 13
45 - 55
8CS
1/2 - 13
45 - 55
10CS
5/8 - 11
80 - 100