GE Industrial Solutions SG Series 400 & 500 Installation Guide User Manual
Ge digital energy power quality, Installation guide, Imagination at work
Table of contents
Document Outline
- 1 IMPORTANT SAFETY INSTRUCTIONS
- 2 LAYOUT
- 3 INSTALLATION
- 3.1 TRANSPORT
- 3.2 DELIVERY
- 3.3 STORAGE
- 3.4 PLACE OF INSTALLATION
- 3.5 VENTILATION AND COOLING
- 3.6 UNPACKING
- 3.7 ELECTRICAL WIRING
- 3.8 WIRING CONNECTION
- 3.8.1 Power connections
- 3.8.2 Power connection with common input utility
- 3.8.3 Power connection with dual input utility (option)
- 3.8.4 Battery and External Battery Breaker connection
- 3.8.5 Interface to External Bypass for single unit
- 3.8.6 Connections to External Bypass switch in case of RPA Parallel System
- 3.8.7 Set-up for SG Series 400 & 500 intended to be operated in eBoost™ Operation Mode
- 3.9 RPA PARALLEL SYSTEM CONNECTION
- 4 CUSTOMER INTERFACE
- 4.1 CUSTOMER INTERFACE
- 4.1.1 Serial Port J3
- 4.1.2 Output free potential contacts
- 4.1.3 Programmable input free contacts
- 4.1.4 Gen Set Signaling (GEN ON)
- 4.1.5 AUX external Maintenance Bypass
- 4.1.6 eBoost/IEMi control signal
- 4.1.7 Auxiliary Power Supply (APS) 24Vdc and Battery Breaker Release
- 4.1.8 EPO (Emergency Power Off) Input contact
- 4.1 CUSTOMER INTERFACE
- 5 NOTES