Step 3 – Install the Rotary Handle
1.
Drill holes on the enclosure door to
accommodate mounting the handle assembly, as
shown in Figure 9. The handle location on the
door is illustrated in Figure 10. Be sure that the
larger hole in Figure 9 is centered over the end
of the crank assembly or the extension shaft, as
appropriate.
DEH41025
2.
Place the rotary handle assembly [6] on the
door with the locating feature, shown in Figure
11, placed in the small hole drilled in step 1.
Handle to be rotated to OFF position while
locking as shown in Fig10.
3.
Secure the handle assembly to the door as
follows, depending on which kit variant you are
using:
a. For kit FENRN, use the plastic nut [5] to
secure the handle to the door.
b. For kit FENRT, if the length L of the shaft
[9] is less than 9 13/16 inches (250 mm),
use the plastic nut [5] to secure the
handle to the door. If the shaft is longer
than 9 13/16 inches (250 mm), use the
funnel [10] to secure the handle to the
door.
4.
Close the enclosure door and verify that the end
of the crank assembly or the extension shaft, as
appropriate, locks into the center of the handle
assembly, as illustrated in Figure 1.
Figure 10. FENRH handle location on the enclosure
door.
Figure 11. Installing the rotary handle assembly.
Figure 9. Hole pattern for mounting the handle assembly
on the enclosure door.
φ0.24
[6.00]
Center of Top Right
Breaker Mounting Hole
3.15
”
min
3.15
”
min
(80.0)
(80.0)
Locating Feature
[6]
[10]
[5]