Powervac, 10 “y” relay replacement – GE Industrial Solutions PowerVac 5kV VL PV VL 4.16-250-0 User Manual
Page 49

49
Figure 46. Front View of ML-19 Breaker Mechanism (Upper)
1
Opening Spring
5
Opening Spring
2
Charging Motor
6
Manual Trip Button
3
Close Spring
7
Open/Close Indicator
4
Anti-pump Relay
8
Counter
9 Motor Cutoff Switch
6
5
4
3
2
1
PowerVac
®
5kV Vertical Lift
Chapter 12. Repair and Replacement
12-9 Motor Replacement
With the breaker open and the closing spring
discharged, disconnect motor leads. Remove
three (3) 3/8-16 hex capscrews securing the
motor to the mechanism plates. Disengage
the motor output shaft from the charge linkage
arms and withdraw motor.
To install the new motor, reverse the above pro-
cedure.
12-10 “Y” Relay Replacement
Before removing the “Y” relay, make sure all
leads are marked with terminal locations (fig-
ure 41). Next, disconnect all leads and remove
the two fasteners securing the “Y” relay’s shock
absorbing mounting bracket to the mechanism
rear plate. Withdraw relay and bracket. Remove
fasteners securing relay to mounting bracket.
Reverse above procedure to install new anti
pump relay.
8
7
9
- EntelliGuard G Spring charge Contact (3 pages)
- Austin Lynx II SIP (19 pages)
- TLE Series 225-500 User Manual (90 pages)
- Power Mark Gold Generator Interlock Kit (2 pages)
- CAR2548FP series (15 pages)
- Spectra Series Power Panelboards AEG47 and AEG47S (1 page)
- GE TR7000 Series (17 pages)
- Record Plus Motor Operator Mechanism: FC100 (6 pages)
- Spectra Series Power Panelboards Endwall Kit (1 page)
- ProTrip Conversion Kits DB-75, DBL-75, DB-100, DBL-100 (16 pages)
- Spectra II Series Busway Plugs (2 pages)
- Spectra Series Power Panelboards AMC2GM and AMC3GM (2 pages)
- EntelliGuard 800–2000 A Frames, 240–600 Vac Maintenance Manual (64 pages)
- EntelliGuard G Ready To Close (4 pages)
- Position Switch Kit (12 pages)
- Spectra Series Power Panelboards AMCB4QD and AMCB6QD (4 pages)
- Record Plus TDR Door-Ring Interlock Kit: FC100 (4 pages)
- ProTrip Conversion Kits DB-15 (20 pages)
- Record Plus TDR, NEMA 1, 12: FE250 (5 pages)
- ATL010A0X43-SR (21 pages)
- Spectra Series Power Panelboards 30–200 Ampere Fusible Switch (2 pages)
- CAR2512FP Front-End (15 pages)
- CP2000AC54TE (20 pages)
- MX150_MX250 Modbus Network Card (27 pages)
- Spectra Series Power Panelboards 800 & 1200 Ampere Fusible Switch (2 pages)
- Spectra Series Fusible Switch Units J & T (4 pages)
- EntelliGuard G NETWORK INTERLOCK DEVICE (3 pages)
- EntelliGuard TU Trip Units (106 pages)
- ZBTSD Series (36 pages)
- AF-600 FP Profibus DP (91 pages)
- Neutral Mounting Kit - DNK400 (1 page)
- Record Plus Variable Depth Operating Mechanism: FE250 (4 pages)
- Spectra Series Power Panelboards 30–60 Ampere Expansion Kit (4 pages)
- Power Break II Undervoltage Release (4 pages)
- Record Plus Shunt Trip and Undervoltage Release (4 pages)
- EntelliGuard G Drawout Secondary Disconnect (4 pages)
- ACE4000T SERIES (2 pages)
- SPSA600 (12 pages)
- Dry-Type General Purpose Power Transformers (8 pages)
- Power Express Class 2 (8 pages)
- Austin MegaLynx (20 pages)
- CAR1612FP series (7 pages)
- H5692448 Power Systems Infinity M1 (NE-M) (76 pages)
- CAR2024FP series (7 pages)
- EBVW020A0B Barracuda Series (18 pages)