10. Lifting and Stacking the Modules
PNEG-1708 GSI Modular Tower Dryer
61
10. To stack additional sections, repeat the process as described above - always remember to line up
the ladder brackets on the modules -- and follow the suggested sequence illustrated earlier in
this chapter.
•
Consider the orientation of each module as it pertains to ladders and catwalks before placing it
on the module for connection.
•
Secure the module with clevis hooks and lifting straps. Lift with crane and place on top of
next module.
•
Place section together but do not fully rest upper section on lower section.
•
Use hammers and punches to line up connecting holes in channels both inside and outside
of dryer.
•
Insert nut and bolt and finger tighten in every hole or every other hole as appropriate.
•
Tighten with power impact.
•
Caulk gaps with clear food-grade silicone as needed.
Figure 10N Gap Un-Caulked
Figure 10O Gap Caulked
NOTE: ALWAYS stack and connect so that as much work as possible is done as close to the ground
as possible. Use the illustrations at the beginning of this chapter as a guide to accomplish this.
Caulk seam
Channels