Grain Systems PNEG-1708 User Manual
Page 59

10. Lifting and Stacking the Modules
PNEG-1708 GSI Modular Tower Dryer
59
8. On all models of the GSI Modular Tower Dryer, the first two (2) connecting seams - between the
base/unload module and Module 2 and between Module 2 and Module 3 - require a nut and bolt in
EVERY hole of the connecting channel, both INSIDE and OUTSIDE of the dryer.
Figure 10K
a. For all other connecting seam after/above the first two (2), every other hole may be bolted.
OUTSIDE of dryer: Two (2) connecting channels between two (2) modules.
NOTE: Every connecting hole must have a nut and bolt in place.
INSIDE of dryer: Two (2) connecting channels between two (2) modules.
Outside channels - Bolted every other hole
Inside channels - Bolted every hole
See also other documents in the category Grain Systems Conditioners:
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)