7. Placing and Installing the Base/Unload Module
Base/Unload Module Placement Considerations
If the concrete foundation is ready and adequately cured, place the base/unload module on it and take
careful and complete consideration of the surrounding equipment. Be sure to consider any planned
options such as augers and any potential equipment to be added later.
1. Consider the location of the electrical box and control panel. Orient base/unload module so that
personnel will have adequate and safe access to the electrical box and control panel. Remember,
the Vision control box can be remote mounted.
2. Consider any auxiliary equipment that will be used with the GSI Modular Dryer. One set of X-braces
on the unload may be removed without compromising structural integrity to allow for easier access.
3. Ensure that there is adequate overhead clearance for the entire tower dryer height and that the
clearance between the dryer walls and other equipment is sufficient to allow for catwalks
and/or platforms.
Figure 7A