Lifting and stacking the modules – Grain Systems PNEG-1708 User Manual
Page 58

10. Lifting and Stacking the Modules
58
PNEG-1708 GSI Modular Tower Dryer
6. When stacking one module on top of another, be sure to line up ladder brackets.
In
, ladder brackets are circled.
Figure 10I
7. Installation should proceed with a team of two (2) working to connect the modules from inside of the
dryer and two (2) working to connect the modules on the outside of the module.
For ease of assembly, place all tools, hardware and step ladders inside the module before stacking
another module on top of it.
shows a team of two (2) working to connect the modules on the inside.
Figure 10J
NOTE: For best results, use a two (2) person team on the inside and a two (2) person team on the outside
of the module dryer when connecting modules.
Ladder brackets
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)