beautypg.com

G. continuity buzzer, Instrument set-up, Measurement procedure – Test Products International 440 User Manual

Page 22

background image

23

21

g.

Continuity Buzzer

WARNING!

Do not attempt to make continuity measurements with cir-
cuit energized.

Instrument set-up:

FUNCTION

BLACK RED
TEST LEAD

TEST LEAD

COM

V

Measurement Procedure:

1.

Disconnect power to circuit to be measured.

2.

Plug black test lead into the COM input jack.

3.

Plug the red test lead into the V

input jack.

4.

Set the rotary switch to the

function.

5.

Press the F2 button to activate the continuity buzzer.

6.

Connect test leads to circuit to be measured.

7.

Listen for the buzzer to confirm continuity.

!