Veris Technologies pH Manager - Operating Instructions User Manual
Page 30
Pub.# OM17-MSP-pH
4-1
SECTION 4
pH Manager Implement
Set-up and Field Operations
Implement Overview (MSP)
Figure 1
12 Volt Power and Hydraulics Set-up
If the unit has been crated and delivered via closed-van commercial freight, the tongue (if
equipped) may need to be installed prior to use. Prior to operating the implement for the first time,
it is important to check all fasteners
– some may have loosened during shipment. Route cables
(figure 2) and hydraulic hoses along tongue and through hose guide. Tie-strap securely. Connect
electrical cables to battery. Be careful to attach black cable to negative/ground terminal. DO NOT
REVERSE POLARITY.
External
controller
Furrow
closers
Tank and pumps
for electrode
cleaning
Wash
nozzles
Sampler shoe
and scraper
EC
coulter-
electrodes
Pull-tongue
(opt.)
Hyd. valves
(under tank)
Road kit (opt.)